The objective of this project is to investigate the feasibility of developing a robotic-system to manufacture steel orthotropic panels for bridge decks. Bridge decks in all regions of the country are being replaced by various methods, one of which is the use of prefabricated steel panels. These steel panels are expensive to fabricate and can only be used if the economy studies indicate a cost-benefit. This project will evaluate the development and costs encountered when a robotic system is designed to produce the panels economically and at a faster rate.

Project Start
Project End
Budget Start
1986-08-15
Budget End
1988-01-31
Support Year
Fiscal Year
1986
Total Cost
$30,000
Indirect Cost
Name
University of Colorado at Boulder
Department
Type
DUNS #
City
Boulder
State
CO
Country
United States
Zip Code
80309